The main objective of the project entitled "study on the Direct Diversion Irrigation Systems for" Tao-Yuan Irrigation main Canals (StageⅡ) "(hereunder called "this project") is a plan study ?.to directly intake/divert water from the Tao-Yuan main canal, and ?.the detailed design for directly diverting water from a section of irrigation system situated between the Chuang-Li Freeway and the siphon intake of Kuang-fu Canal. Based on the various data of this study/project and after detailed discussion on many aspects, having been made, he report was concluded to adopt "the improvement plan of using a pipeline parallelly running along the canal system and together with its management method". Then the detailed design for the section between the Chung-Li Freeway and the siphon intake of kuang-fu canal was proceeded. Based on estimate, this project has to spend NT$60,180,000 for execution. After completion of this project, modernized facilities--remote control, remote measurement, etc., various kinds of equipments can be utilized, besides by adopting scientific management method, it can fully seize the water source for arrangement, thus reduce the unnecessary waste, and completely save the manpower resources.
計畫主持人
戴欽興
Project Director
Chin-Hsing Tai
關鍵字
直接灌溉、細部設計、桃園大圳
Keywords
Direct Diversion Irrigation Detailed design、Tao-Yuan Main Canal